new building progress
Our new building project is moving right along. They tell us that they are still running on schedule and say that our completion date will be in mid May. It doesn't seem like that's possible, but I will say it is finally looking like there is progress being made.
They are almost through with the interior framing, the rough electrical, HVAC and plumbing are being installed now and they have been finishing up the concrete in the auditorium. It's a little tricky because of the sloped flooring.
It's kind of funny, but a construction job goes from looking small at times, to large as they start doing certain things.
A couple of quick facts about the building:
Auditorium seating capacity: 1,035
Total square feet of new building: 36,000 (with existing building, total square feet: 54,000)
New lobby is basically 3 times as large as current lobby